Project Title: SWaN Regeneration - NEWSTEAD - Phase A
BSP Client: Home Group
Architect: Halsall Lloyd Partnership
Project Description: Residential development of 56 units.
Project Value: £6,600,000
Project Duration: 15 months
BSP Role: Design, and detailing of the Civil Engineering elements of the project including highways, drainage, and external works designs.

Design and detailing of the Structural Engineering elements of the project including, foundation designs and superstructure design.
Technical Features: Roads and Highway Drains to be adopted by Sheffield City Council under a Section 38 Agreement.

Sewers to be adopted by Yorkshire Water under a Section 104 Agreement.

An Existing Sewer to be diverted and agreed with Yorkshire Water under a S185 Agreement.

Private Sewers and Private levels to be approved by Sheffield City Council - Building Control.

Foundation and superstructure design and detailing.

Retaining wall design and detailing.
Site Issues: Site layout is unconventional.

Large fall in levels across site.



12 Oxford Street, Nottingham NG1 5BG T: 0115 840 2227 F: 0115 840 2228
5 Pride Point Drive, Pride Park, Derby DE24 8BX T: 01332 374 880 F: 01332 374 889
Suite B, Floor 3, 24 De Montfort Street, Leicester LE1 7GB T: 0114 204 7766 F: 0116 204 7769

  structural
  civil
  transportation
  environmental
  geotechnical