sitemap
BSP Consulting

WHAT'S NEW

HOME

ABOUT US

CONTACT US

JOB VACANCIES

BROCHURE & NEWSLETTER DOWNLOADS

PROJECT ARCHIVE

BACK

Project Title: South Lynn Millennium Village - Residential Phase 1
BSP Client: Morston Muckworks
Architect: Church Lukas Architects - Birmingham
Project Description: Millennium Village - Residential development of 109 units
Project Value: £7,000,000
Project Duration: 20 months
BSP Role: To design and detail the civil engineering elements of the project, including highways, drainage, external works, retaining walls and flood risk analysis.

To provide advice and example details for structural aspects during the design and pricing stage.
Technical Features: Roads to be adopted by Norfolk County Council under a Section 38 Agreement although road layouts are unconventional.

Sewers adopted by Anglian Water under a Section 104 Agreement and discharged into a Drainage Board Watercourse.

Sewer to be discharged into.

Retaining wall design and detailing.

Flooding risk issues to be agreed with the Environment Agency
Site Issues: Site layout is unconventional.

Site remediation due to contamination. Remediation strategy consists partly of 'Dig and Dump' for the hot spots and then raising site levels as a barrier for residual contamination.

Site located adjacent to the Puny Drain which outfalls into the tidal River Ouse. It is also adjacent to the River Nar. Kings Lynn has a history of flooding.



12 Oxford Street, Nottingham NG1 5BG T: 0115 840 2227 F: 0115 840 2228
5 Pride Point Drive, Pride Park, Derby DE24 8BX T: 01332 374 880 F: 01332 374 889
Suite B, Floor 3, 24 De Montfort Street, Leicester LE1 7GB T: 0114 204 7766 F: 0116 204 7769

  structural
  civil
  transportation
  environmental
  geotechnical