Project Title:
|
Brockington College Gymnasium
|
|
| BSP Client:
|
Cavill Fabrication / Marriott Construction
|
|
| Architect:
|
Building Design Partnership
|
|
| End Client:
|
Leicester County Council
|
|
| Project Description:
|
Steel framed School buildings construced over reinforced concrete frame
|
| Project Value:
|
£20,000,000
|
| Project Duration:
|
N/A
|
| BSP Role:
|
Design of steel frame
|
| Technical Features:
|
The gymnasium structure was designed by another engineer but was considered uneconomical to construct. BSP provided a lightweight steel frame to maintain the proposed façade and cladding. Working with Cavill fabrication the solution was brought in on cost and under the programmed time.
Features included the cantilever structure and the tall ‘Y’ columns to the main building.
|
|
|
|
|
12 Oxford Street, Nottingham NG1 5BG T: 0115 840 2227 F: 0115 840 2228
5 Pride Point Drive, Pride Park, Derby DE24 8BX T: 01332 374 880 F: 01332 374 889
Suite B, Floor 3, 24 De Montfort Street, Leicester LE1 7GB T: 0114 204 7766 F: 0116 204 7769
|